OpenBCM V1.07b12 (Linux)

Packet Radio Mailbox

IW8PGT

[Mendicino(CS)-Italy]

 Login: GUEST





  
G8MNY  > TECH     20.07.14 11:22l 100 Lines 4209 Bytes #999 (0) @ WW
BID : 3293_GB7CIP
Read: GUEST
Subj: 70cm 22el Yagi
Path: IW8PGT<IZ3LSV<I0OJJ<GB7CIP
Sent: 140720/0738Z @:GB7CIP.#32.GBR.EU #:3293 [Caterham Surrey GBR] $:3293_GB7C
From: G8MNY@GB7CIP.#32.GBR.EU
To  : TECH@WW

       Distance     Length
Ref.      30         346     Boom lengths: Front boom 7/8" OD x 0.049" wall
DE       134         340               6061-T6 tubing 1530 mm (60 1/4")
D-1      176         321               long.
D-2      254         311
D-3      362         305                   Centre boom 1" OD x 0.058" wall
D-4      496         301                   6061-T6 tubing
D-5      652         297
D-6      828         295                   Rear boom 7/8" OD x 0.049" wall
D-7     1020         293                   6061-T6 tubing 1580 mm (62 5/16")
D-8     1226         291
D-9     1444         289
D-10    1672         288
D-11    1909         286
D-12    2152         285
D-13    2403         284
D-14    2659         283
D-15    2920         281
D-16    3184         280
D-17    3452         279
D-18    3723         278
D-19    3997         277
D-20    4272         276
-------------------------------------------------------------------------
22 el. Boom Construction lengths.

                         Double up boom where mast clamp
                  mounts. use 12" of 7/8" OD x 0.049 wall - 6061
                                     |
                   No. 8-32 screw    |  Slot & use
                    (2 places)       |  clamp (2 places)
                        v           (v)        v
--------------------=#==+===========|=|=====+==#=------------------------
^                   ^                           ^                       ^
|----- 1412 mm -----|---------- 1415 mm --------|------- 1475 mm -------|
      (55 9/16")               (55 11/16")              (58 1/16")

|-------------------------------4302 mm --------------------------------|
                             (169 - 5/16")

--------------------------------------------------------------------------
Element mounting.
The elements are installed through the boom using plastic insulators between
the el. & boom. Stainless steel push-nut retaining rings hold the el. in place.
-------------------------------------------------------------------------
Details for the driven element.

<------------------------------- 340 mm ----------------------------->
<-----62 mm---->v clamp 0.03 alum. 3/8" wide        <---- 62 mm ----->
----------------|-----------------( )--------------|------------------
< 38 mm  >------|---------------o| .>|o------------|-----\ 15 mm
                ^       ^        |___| \        ^
           Solder   T wire 122     1" Balun     T wire 140 mm length of
            lug     mm length of   ^            #12 wire make straight portion
                    no. 12 wire.   |            of T wire 122 mm long; form
                                   |            & solder to N-connector.
                                   |
                              use UG-58a/u
                              connector
                              mounted on
                              small bracket.

Balun made from UT-141 copper-shielded coax, RG-303 or RG-142/u Teflon-
insulated cable could be used.

 --==|======================================================|==--
   ^ |<                   233 mm shield                    >|   ^
   |                                                          centre
   5 mm                                                       core
   Dielectric

Driven element side looking >

solder centre of the UG-58a/u & right side if the Balun then to right driven
element. left side of the Balun solder to left driven element.


                         19 mm - Centre line of driven element to
  Centre line of - 15 mm  v      rear face of n-connector bracket.
 n-connector        v |   |_
 above boom.       --   /-|_ <UG-58a/u
                       /--|------------------<Balun
               =======O====\============================
                            \
                             Solder log attached to the
                             bottom screw on connector, bend 90 d
                             & solder to UT-141 shield.

Thanks to the ARRL Antenna book.
Offered by Jack - KE4IQQ - AAAC #1
Address: KE4IQQ @ KF4BPX.#OKE.FL.USA.NOAM


Why Don't U send an interesting bul?

73 De John, G8MNY @ GB7CIP


Read previous mail | Read next mail


 11.05.2024 22:21:12lGo back Go up